Hydropower Potential in near Future Climate over Burundi (East Africa) : A Case study of Rwegura Catchment

Manirakiza, C´elestin and Emmanuel, Lawin Agnid´e and Batablinl`e, Lamboni and Niyongendako, Marc (2021) Hydropower Potential in near Future Climate over Burundi (East Africa) : A Case study of Rwegura Catchment. Journal of Energy Research and Reviews, 7 (1). pp. 51-65. ISSN 2581-8368

[thumbnail of 117-Article Text-216-1-10-20220914.pdf] Text
117-Article Text-216-1-10-20220914.pdf - Published Version

Download (3MB)

Abstract

This paper assessed the near future projected hydropower potential over Rwegura catchment hosting, up to date, the biggest hydropower plant of Burundi. Observed and gridded data were considered over the period 1981

Item Type: Article
Subjects: Pacific Library > Energy
Depositing User: Unnamed user with email support@pacificlibrary.org
Date Deposited: 12 Jan 2023 08:45
Last Modified: 22 May 2024 09:58
URI: http://editor.classicopenlibrary.com/id/eprint/200

Actions (login required)

View Item
View Item